Construction of a school complex, incorporating a kindergarten, elementary, middle and secondary schools,. Included in the complex is an auditorium, gymnasium, and cafeteria. The building system used is a reinforced concrete structure: in-situ poured columns and walls with prefabricated beams and floor slabs. The labour force was entirely domestic.
Source: Aga Khan Trust for Culture